This «RiskRank» metric is a general litmus test for the quality of the «Hashocean» HYIP took in its entirety, defined by many specifications. Below is a detailed analysis and review of hashocean.com and the results from 0 to 10 points.
hashocean.com good quality signs
The domain hashocean.com is registered for twelve years, which is a good thing;
Good hosting ensures the proper response level and excellent website access;
The website content is unique;
IP address not used by other HYIPs;
hashocean.com poor signs
Free SSL without a confidence guarantee;
Plagiarized design elements from other HYIPs;
Not listed on trusted HYIP monitors;
0.0
This project is a scam and stops paying on Nov 04, 2016.
Domain:
hashocean.com is registered for a 11 years
by ENOM, INC.
Join using Google, Telegram, Facebook, Twitter account or e-mail!
Content
#Tags
Here's what it says on the hashocean.com website:
We are opening the seventh more
powerful data centre in Nuremberg. At this moment this centre is able to
storage the amount of power volume up to 11900 Mh/s. Due to the opening
of data centre we remove all current restrictions on maximum purchase
volume.
Engineering systems ensure uninterrupted operation of the data center
24 hours 7 days a week, 365 days a year. To do this, absolutely all the
items are reserved, ie have a double, which will take over the load if
the primary fails.
In the period of 8 to 9 February we
are going to realize some scheduled technical works. At this time our
specialists will scale the infrastructure to launch a new data centre in
Nuremberg. During this time you may deal with some service interruption
in call-centre operation.
It’s time to sum up the results of 2015 and remember the most
important events of our project. First of all we would like to thank our
users, the whole amount of whom is over 270 000 people. The important
part of new users recruiting belongs to affiliate program. Over 28 000
of users get their daily profit on purchased powers that they bought
with the help of this affiliate program.
Moreover this year we’ve launched a powerful data center with the
total power amount up to 6500 Mh/s. To fit the needs of our users we’ve
started developing our seventh data centre in Nuremberg. We will write
more about this in our following news postings.
In order to meet our consumers’
growing needs we are continuing to extend our infrastructure and today
we have brought into operation our sixth data centre in Singapore. At
this moment the total capacity of all our data centres is 28.1 GH/s. We
are going to build the seventh data centre soon (the location of this
data centre is under negotiation).
In the period of 26 to 28 May we
are going to realize some scheduled technical works. At this time our
specialists will scale the infrastructure to launch a new data centre in
Singapore. During this time you may deal with some service interruption
in call-centre operation.
engineering systems ensure uninterrupted operationscheduled technical worksve started developingmaximum purchase volumepowerful data centerpowerful data centresixth data centreusers recruiting belongsseventh data centretotal power amountpower volumedata centercentre operationdata centreve launchedtotal capacitydata centresnews postingsimportant partaffiliate programpurchased powersdaily profitimportant eventsprimary failscurrent restrictionsservice interruption4 hours 7 daysconsumers&rsquooperationseventhcentreamountusers65 days&rsquo
DISCLAIMER: Please note that we do not promote or recommend any programs/projects/games listed here.
Your use of this web site is at your own risk. The materials presented on this site may not reflect the most current legal developments, verdicts or settlements, or the correct law of the jurisdiction in which you reside. All information available on or accessed through this site, is provided "as is." These materials may be changed, improved, or updated without notice.